High coal injection into the blast furnace under high productivity*
Forts taux d’injection de charbon combinés à une productivité élevée au haut-fourneau
Posco Kwangyang No. 4 furnace is currently operated with a PCI rate of 150 kg/tHM, at the high production level of 270 t/m3.d. This performance has been achieved thanks to an optimization of the operating conditions, a control of burden distribution and an expert system guided operation.
© La Revue de Métallurgie 1996
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.