Operational stabilization of continuous casting No. 2 at CST
This project was developed in order to keep the production of the CST Continuous Casting No. 2 steady at 2.8 Mt/year. The main focus was the reduction of segments failure that was caused by short life of bearings, a forth of the time expected. The goal established was well overreached due to a set of improvements made by operation, maintenance, technical unit and engineering: reduction of the number of break-outs; improvements on control and raise of casting speed.
© La Revue de Métallurgie, 2004
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.