Slag splashing at the Fos steelplant: new converters scheduling and results
Slag splashing is a way of maintaining converters lining, started at the Fos steel plant in December 2003. Systematic slag splashing on converters lining, by nitrogen injection with the top lance, after tapping, protects refractory. The aim of the project is to disconnect the two converters, from the refractory point of view, and to reach a refractory lining lifetime of 5,000 heats.
© La Revue de Métallurgie, 2005
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.