Issue |
Rev. Met. Paris
Volume 98, Number 4, April 2001
Aciéries, coulées continues, réfractaires
|
|
---|---|---|
Page(s) | 375 - 382 | |
DOI | https://doi.org/10.1051/metal:2001186 | |
Published online | 25 October 2002 |
Improvement of bloom casting and high reduction breakdown process
In May 1998, Muroran Works installed a near-net shape casting and compact high reduction (NCR) process in its steelmaking plant. The No.3 continuous casting machine was rearranged to cast middle cross section blooms, and a reheating furnace and a 2-passes high reduction breakdown mill were newly equipped. No.3 CCM casts square 220 mm mould size blooms and the breakdown mill reduces their cross section to square 162 mm. This combined process improved the quality of the cast billets and achieved high productivity.
© La Revue de Métallurgie, 2001
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.