“Zero-defect” and ppm strategy for semi-finished steel products, bars and wire rod from the point of view of the steel manufacturers
This report, a conclusion of a VDEh working group, has the aim to show that a 100% inspection at a suitable stage of the whole production line is necessary to reach the “zero-defect”. This work should lead to a better understanding by the customers and steel consumers of the limits, which are achievable with the current techniques in connexion with the discussion about the “zero-defect”.
© La Revue de Métallurgie, 2002
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.