Issue |
Rev. Met. Paris
Volume 99, Number 7-8, July-August 2002
Laminage à chaud et à froidLignes aval de l'usine à froid |
|
---|---|---|
Page(s) | 653 - 660 | |
DOI | https://doi.org/10.1051/metal:2002199 | |
Published online | 25 October 2002 |
Increase of the width of pickling line No. 1 at Ferblatil
The revamping of pickling line No. 1 at Ferblatil, with an increase of its width, was completed at the beginning of 2001. The width increase provides new possibilities for the supply of metal to all finishing lines of the basin of Liège. The start up conditions of the revamped line and the first operational results are presented.
© La Revue de Métallurgie, 2002
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.