Issue |
Rev. Met. Paris
Volume 102, Number 6, June 2005
Coulée continueHaut-Fourneau Environnement Contrôle de la qualité Galvanisation |
|
---|---|---|
Page(s) | 413 - 420 | |
Section | Articles techniques commmuns "Stahl und Eisen" - "Revue de Métallurgie" | |
DOI | https://doi.org/10.1051/metal:2005178 | |
Published online | 26 July 2005 |
Long campaign life of CST No. 1 blast furnace
Companhia Siderurgica de Tubarão (CST) No. 1 blast furnace has been in continuous operation for 21 years, accomplishing a high operational performance with high productivity and low fuel consumption. Seeking its biggest challenge of 18,500 t/m3-IV of productivity, several jobs have been developed in order to extend the furnace campaign until 2008. This paper shows the results of these activities and proposes a different concept of hearth wear.
© La Revue de Métallurgie, 2005
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.