Issue |
Rev. Met. Paris
Volume 102, Number 7-8, July-August 2005
CokerieAgglomération Haut-fourneau Laminage à froid Galvanisation Spectroscopie |
|
---|---|---|
Page(s) | 495 - 502 | |
DOI | https://doi.org/10.1051/metal:2005102 | |
Published online | 06 September 2005 |
Options for maintaining the production capacity of coke oven plants
Apart from installation of new batteries, there exist other options for keeping respectively increasing the production capacity of a coke piant. Economic and environmental requirements have to be taken into consideration ieading to very simple solutions such as heating up of old batteries which have been cooled down followed by partial hot repairs, through-wall repairs and pas up rebuilds. Modernizations with regard to anchoring systems, heating conditions and reduction of typical emissions may be implemented in most cases.
© La Revue de Métallurgie, 2005
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.