Issue |
Rev. Met. Paris
Volume 104, Number 11, Novembre 2007
AciérieLaminage Utilisation de l'acier |
|
---|---|---|
Page(s) | 551 - 554 | |
DOI | https://doi.org/10.1051/metal:2007218 | |
Published online | 16 November 2007 |
Electric power co-generation by LDG recovery, CDM Project
The Clean Development Mechanism Project elaboration is reviewed, considering every step from the project design document conception, through validation, the approval by the national authorities and the verification process. The whole development is pioneered by CST ArcelorMittal Brasil, aiming at carbon credits generation and GHG emission reduction. An associated objective is the promotion of sustainable development. The potential of carbon credits generation is estimated to be 440,263 tons of CO2 over a CDM project period of 10 years.
© La Revue de Métallurgie, 2007
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.