Issue |
Metall. Res. Technol.
Volume 112, Number 3, 2015
|
|
---|---|---|
Article Number | 308 | |
Number of page(s) | 12 | |
DOI | https://doi.org/10.1051/metal/2015016 | |
Published online | 15 June 2015 |
Numerical simulation of the liquid steel alloying process in a one-strand tundish with different addition positions and flow control devices
Department of Metals Extraction and Recirculation,
Faculty of Production Engineering and Materials Technology, Czestochowa University of
Technology, 19 Armii Krajowej
Av., 42-200
Czestochowa,
Poland
e-mail: cwudzinski@wip.pcz.pl
Received:
25
November
2014
Accepted:
6
May
2015
The tundish may successfully be used as a rector enabling alloy additions to be fed to liquid steel during continuous casting of steel. The paper presents results describing the process of alloy addition mixing with liquid steel during steady-state casting conditions. The pulse-step method for alloy addition feeding to liquid steel at the tundish stage was developed. The subject of the study is a single-nozzle tundish in the shape of a wedge. Computer simulation of the liquid steel flow and alloy addition behaviour in turbulent motion conditions was done using the Ansys-Fluent® computer program. Computer simulations of alloy addition behaviour in the liquid steel, depending on the alloy addition feed location or the flow control devices (FCD) employed in the tundish, were performed for the sequence of casting 1.5 m × 0.225 m slabs at a speed of 0.9 m/min. The use of the pulse-step method allowed a constant alloy addition concentration in the steel flowing to the mould with satisfactory mixing time.
Key words: Tundish / alloy addition / addition positions / flow control devices / numerical modelling
© EDP Sciences, 2015
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.