Issue |
Rev. Met. Paris
Volume 97, Number 4, Avril 2000
|
|
---|---|---|
Page(s) | 471 - 479 | |
DOI | https://doi.org/10.1051/metal/200097040471 | |
Published online | 13 January 2017 |
New installations, new directions and new results at CST’s ironmaking area*
Nouveaux équipements, nouvelles pratiques et derniers résultats de CST dans le secteur fonte
Since 1993, new and up-to-date pieces of equipment were acquired and installed. At present, they are fully operational and providing a boost in production, quality, cost, yields and on the environmental control.
This paper covers mainly the development in the ironmaking area, emphasized by the increase in production of hot metal and supplies such as sinter, coke and utilities, brought about the commencement of operation of the No. 2 blast furnace.
© La Revue de Métallurgie 2000
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.