Issue |
Rev. Met. Paris
Volume 104, Number 5, May 2007
Haut-fourneauGalvanisation Utilisation de l'acier |
|
---|---|---|
Page(s) | 221 - 230 | |
DOI | https://doi.org/10.1051/metal:2007124 | |
Published online | 22 May 2007 |
Stable and efficient blast furnace operation with high PCI and low coke rate at Arcelor Mittal Flat Carbon W-Europe
Coke production capacity within AM FCWE is not self sufficient for the total HM production. PCI was started up in 2004 at Bremen BF2 and Eisenhüttenstadt BF5, with a ramp up to 180 kg/thm in one year. A working group defined the BF operating conditions leading to stable and efficient operation at high PCI. At Florange BF3 PCI trials at 220 kg/thm were successful. At Dunkerque BF4 and Gent BFA and B, the PCI rate exceeds regularly 210 kg/thm.
© La Revue de Métallurgie, 2007
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.