Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works*
Passage rapide de l’exploitation du haut-fourneau n° 1 au hautfourneau n° 4 de Tobata, usine de Yawata
Nippon Steel Yawata Works operates with only one blast furnace in service. BF No. 1 (inner volume : 4407 m3) was blown off on January 31, 1998 after operating for thirteen years. The third campaign of BF No. 4 (inner volume : 4250 m3) was started the following day and productivity reached 2.0 t/d.m3 IV after fifteen days of operation. This paper describes the characteristics of the relining of No. 4 furnace. Also presented is the background of the speedy switchover of large blast furnace operation and the rapid increase in productivity without any reduction in output.
© La Revue de Métallurgie 2000
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.