Application of the Hybrid Pelletized Sinter (HPS) process at Monlevade Works
Belgo-Mineira, Arcelor Group, has at Monlevade Works one sinterplant with 120 m2 of strand area and its own iron ore mine (Andrade mine). Aiming to increase sinter production combined with the use of 100% of its own iron ore, the Hybrid Pelletized Sinter (HPS) process, developed by JFE (former NKK), was chosen among other alternatives. The HPS process started up at Monlevade Works in December 2002 and since January 2003 100% of Andrade iron ore has been used at the sinterplant. The contractual sinterplant productivity target (42 t/m2.24h) has been achieved.
© La Revue de Métallurgie, 2004
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.