Increasing the productivity of the Arcelor Dunkirk continuous casters
Within the framework of the capacity increase of the Arcelor Dunkirk steel plant up to 6.7 Mt per year, a project of casting speed increase has been carried out, in order to keep a similar average casting time with the new ladle tonnage of 270 t as with the previous one of 250 t. Two axes have been studied: increase of the maximum casting speed (applied for standard Al-killed steel grades); increase of the targeted casting speed for steel grades with high requirements in terms of segregation and internal cracks. This increase was based on the progress achieved in the slab internal soundness control (control of caster geometry and secondary cooling), as well as on an analysis of customer specifications to adapt casting speed to the requirements linked with final product applications.
© La Revue de Métallurgie, 2005
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.