Volume 105, Number 9, September 2008
SinteringElectric Arc Furnace Steelmaking Continuous Casting Environment Hot Rolling |
|
---|---|---|
Page(s) | 408 - 413 | |
DOI | https://doi.org/10.1051/metal:2008058 | |
Published online | 20 September 2008 |
Project to increase sinter machine productivity aiming at attending the ArcelorMittal Tubarão expansion plan for 7.5 million tons/year
In order to increase their production of steel plates to 7.5 million tons/year, ArcelorMittal Tubarão faced the challenge to increase sinter plant productivity from 34.00 t/d/m2 to 42.00 t/d/m2. This was achieved in June 2006 through three main actuators: raw materials, stabilization and optimization of the current equipment and implementation of new technologies.
© La Revue de Métallurgie, 2008
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.