Issue |
Rev. Met. Paris
Volume 106, Number 9, September 2009
Selected papers from 4th ULCOS SEMINAR (Part 1)
|
|
---|---|---|
Page(s) | 387 - 392 | |
Section | Top Gas Recycling Blast Furnace | |
DOI | https://doi.org/10.1051/metal/2009067 | |
Published online | 29 September 2009 |
The Trial of the Top Gas Recycling Blast Furnace at LKAB's EBF and Scale-up
The history of the LKAB's Experimental Blast Furnace is briefly reviewed and an introduction to the ULCOS new blast furnace is presented. The feasibility of the scale-up of the ULCOS New Blast Furnace - UNBF based on previous and new trials results at EBF are concisely discussed. The historical trial results of using the EBF to simulate the conventional industrial blast furnace processes indicated that the EBF is able to imitate the commercial blast furnaces of different size and burden structure. The trial results can be directly extrapolated to the commercial furnaces. The discussions regarding the scale-up of the UNBF showed that based on the EBF as well as the trials of the UNBF concept it is completely feasible to determine the dimensions of a full scale furnace and the process parameters for an industrial scale trial of the UNBF concept.
© La Revue de Métallurgie, 2009
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.