Regular Article
Enhancement of the productivity of non-recovery stamp charge coke oven plant at JSPL Raigarh
1
TS and R&D, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
2
DGM – Coal Technologist, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
3
DGM – Operation, Coke Oven Plant, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
4
DGM – TS and R&D, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
5
GM, HOD – Coke Plant, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
6
AVP, HOD – TS & R&D, Jindal Steel & Power Limited,
Raigarh,
496001 (C.G.), India
* e-mail: rupak.ranjan@jspl.com
Received:
18
July
2020
Accepted:
5
October
2020
In recent past, Jindal Steel & Power Limited, Raigarh unit, has increased the hot metal production capacity by the renovation of the existing blast furnaces. Therefore, the blast furnace coke demand has increased. This excess demand for metallurgical coke production from the existing non-recovery stamp charge coke oven plant was a very tough challenge, because the coke oven plant was already running at rated production capacity. Therefore, to fulfill the requirement of excess coke and to deliver more value to the customers, several initiatives have been taken by the Coke Oven and Technical Services Department within the existing setup. Few approaches had been adopted to increase the productivity of coke by ∼20% without deteriorating the resultant coke quality. This paper describes in details the steps taken to enhance the productivity of non-recovery stamp charge coke oven plant.
Key words: coal blend / process improvement / non-recovery stamp charge cokemaking / productivity / coke quality
© EDP Sciences, 2020
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.