The method of reducing energy consumption in large blast furnace smelting by increasing top pressure
1
Low-Carbon Research Institute, Anhui University of Technology, Maanshan 243000, Anhui, China
2
Key Laboratory of Metallurgy Engineering and Resources Recycling of Ministry of Education, Maanshan 243000, Anhui, China
3
Bayuquan Branch of Angang Steel Co., Ltd., Yingkou 115007, Liaoning, China
* e-mail: dbustb@163.com
Received:
21
June
2023
Accepted:
12
September
2023
Based on the fundamental processes and principles of ironmaking in a BF, an analysis was conducted on the production technical data from 18 large-scale 3200 m3 BFs in China in 2020. The study systematically investigated the influence of top pressure on reduction, air injection, furnace top, energy consumption, and pig iron composition within the BF. Practical operations in a newly No. 1 3200 m3 BF in a Chinese company demonstrated that increasing the top pressure not only effectively improved the smelting process, operational stability, and reduced furnace fluctuations but also led to a decrease in dust emissions, increased pig iron yield and quality, and significantly reduced fuel consumption and process energy consumption. Against the backdrop of dual carbon objectives, gaining a scientific understanding of the dynamic operation principles of the BF smelting process and continuously exploring low-carbon ironmaking methods have become the focus for professionals and researchers in the fields of BF ironmaking, production management, technology, and scientific research.
Key words: large blast furnace / top pressure / production data / low-carbon smelting / high efficiency and low consumption
© EDP Sciences, 2023
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.