Relining in 2001 of BF 4 of Dunkirk
In July 2001, Dunkirk blast furnace 4 achieved a 13 years and 9 months long campaign with a 41.7 millions tons hot metal cumulative output. The relining works had been scheduled within a 65 to 75 days period for a total cost over 150 millions Euros. The objectives of the next campaign are : a daily production over 10,800 tons, a blast furnace life over 20 years without any intermediate repair, a significant improvement of the working conditions and a major reduction of the environmental impact.
© La Revue de Métallurgie, 2002
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.