Issue |
Rev. Met. Paris
Volume 99, Number 3, March 2002
AgglomérationHaut-Fourneau Cokerie |
|
---|---|---|
Page(s) | 215 - 222 | |
DOI | https://doi.org/10.1051/metal:2002115 | |
Published online | 25 October 2002 |
Relining of the Sidmar blast furnace B in 2001
A certain number of changes have been made on the occasion of the relining of blast furnace B at Ghent. They oncern the design of the furnace and the improvement of its cooling system, the repair of the hot blast stoves, the replacement of part of the control equipment and the installation of new measuring devices. Environmental controls and improved working conditions were also at the origin of some changes. The result of this operation is a fine new furnace equipped with the latest measuring and control systems.
© La Revue de Métallurgie, 2002
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.