Issue |
Metall. Res. Technol.
Volume 114, Number 2, 2017
|
|
---|---|---|
Article Number | 204 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/metal/2016062 | |
Published online | 12 April 2017 |
Regular Article
Study on liquid phase formation and fluidity of iron ores
1
College of Materials Science and Engineering, Chongqing University,
Chongqing
400044, China
2
School of Metallurgical and Ecological Engineering, University of Science and Technology of Beijing,
Beijing
100083, China
3
China Metallurgical Industry Planning and Research Institute,
Beijing
100711, China
⁎ e-mail: jeopardize@126.com
Received:
3
August
2015
Received in final form:
16
November
2015
Accepted:
31
October
2016
The sinter strength is guaranteed by liquid phase formation and agglomeration of the unmelted materials. Liquid phase formation and fluidity of iron ores are the basic which have significant influence on the yield and quality of the sinter. In this study, first the thermodynamic analysis of liquid phase formation was carried out with FactSage on seven kinds of domestic and overseas iron ores. Second, the generation speed, the amount of liquid phase and fluidity index of the sinters were measured and analyzed. The results indicated that the sinter liquid formation increased with rising temperature. When the reaction temperature was 1050 °C, a part of iron ore generated some liquid phase at a rapid speed, and the production of the liquid phase of most iron ores reached the highest level at about 1350 °C. As there is a large difference about liquid phase fluidity between different iron ores, the iron ores with worse fluidity could be used for matching with the iron ores of better fluidity in order to meet the quality requirements of the sinter.
Key words: iron ores / sinter / liquid phase formation / liquid phase fluidity
© EDP Sciences, 2017
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.